HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery

Product Details
Customization: Available
After-sales Service: Guidance and Installing Service
Scale: Middle Bridge
Still deciding? Get samples of US$ 1500/Ton
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Experienced Team
The supplier has 5 foreign trading staff(s) and 3 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (33)
  • HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
  • HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
  • HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
  • HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
  • HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
  • HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • Our Advantages
  • Certifications
  • After Sales Service
  • Our Customers
  • FAQ
Overview

Basic Info.

Model NO.
HD200/CB200/ZB200/Compact-200
Usage
Footbridge, Highway Bridge, Over Water Bridge, Railway Bridge, Viaduct, Supporting System
Steel Grade
S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460
Loading Capacity
Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24
Carriage Way Width
3.15m Std. /4.2m Ew/7.35m Double Lanes
Model Alias
CB200/Zb200/Compact-200
Maximum Span
60.96m for Single Lane/45.72m for Two Lanes
Hot DIP Galvanized
ISO1461/AS/NZS 4680/ASTM-A123/BS1706 or Equivalent
Painting
Long-Term Epoxy Zinc-Rich Kit or Temporary Alkyd K
Transport Package
Transported by Container/Truck in Strong Packing
Specification
Panel dimension 3.048m*2.134m
Trademark
Great Wall & Evercross
Origin
Zhenjiang
HS Code
7308100000
Production Capacity
100, 000 Tons

Product Description

Product Description
 

Bailey bridge is a type of portable, pre-fabricated, truss bridge.t was developed by Donald Coleman Bailey for emergency use.During 1980s,it was introduced to China From UK.

Bailey bridge is standard bridge equipment,adopted extensively and the most popular in the world,possessing the features of simple structure,convenient transport,speedy erection and easy disassembling.While having the advantage of heavy loading capacity,great stability and long fatigue life being capable of an alternative span,long capacity and mixture form to erect all kinds and usage of temporary bridges,emergency bridges and fixed bridges.The bridge has the advantages of few components,light weight and low cost.

We have three producing lines to manufacture Compact-100 and Compact-200

The surface disposal is painting,galvanized or anti-skid wearing such as a polyurethane bonded bauxite chip system or similar according to the requirement.
It is suitable for the load designs of HS-15,HS-20,HS-25,HL-93 and pedrail-50 etc.



HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery

Compact-100 Bailey Bridge Truss Allowable Internal Force Table
Bridge Type Unreinforced Bridge Reinforce Bridge
    Allowable Internal Force SS DS TS DD TD SS DS TS DD TD
Allowable Bending Moment[M](kN·m) 788.2 1576.4 2246.4 3265.4 4653.2 1687.5 3375 4809.4 6750 9618.8
Allowable Shears force[Q](kN) 245.2 490.5 698.9 490.5 698.9 245.2 490.5 698.9 490.5 698.9

Note: The value in the table is the value of half of the bridge, and the full bridge should be multiplied by 2.

Compact-200 Bailey bridge Truss Allowable Internal Force Table(Half-bridge)

 Allowable Internal Force  Allowable Bending Moment[M]
(kN·m)

 
Allowable Shears force[Q]
(kN)

 
High-shears Union Allowable Shears Force [Q]H
(kN)

 
        Configuration                           
SS SS 1127 257 348
SSR 2254 257 348
DS DS 2525 514 696
DSR1 3381 514 696
DSR2 5050 514 696
TS TS 3800 771 1044
TSR2 5635 771 1044
TSR3 7600 771 1044
QS QS 5050 1028 1392
QSR3 7889 1028 1392
QSR4 10100 1028 1392
GREAT WALL STEEL BRIDGE SPECIFICATION
GREAT WALL
STEEL BRIDGE
Bailey bridge(Compact-200, Compact-100, LSB, PB100, China-321,BSB)
Modular bridge( GWD, HBD60,CB300,Delta, 450-type,etc),
Truss Bridge,Warren bridge,
Arch bridge, Plate bridge,Beam bridge,Box girder bridge,
Suspension bridge,Cable-stayed bridge,
Floating bridge,etc
DESIGN SPANS 10M TO 300M Single span
CARRIAGE WAY SINGLE LANE, DOUBLE LANES,MULTILANE,WALKWAY,ETC
LOADING CAPACITY AASHTO HL93.HS15-44,HS20-44,HS25-44,
BS5400 HA+20HB,HA+30HB,
AS5100 Truck-T44,
IRC 70R Class A/B,
NATO STANAG MLC80/MLC110.
Truck-60T,Trailer-80/100Ton,etc
Korea 1st grade bridge DB24
STEEL GRADE  EN10025 S355JR S355J0/EN10219 S460J0/EN10113 S460N/BS4360 Grade 55C
AS/NZS3678/3679/1163/Grade 350,
ASTM A572/A572M GR50/GR65
GB1591 GB355B/C/D/460C,etc
CERTIFICATES ISO9001, ISO14001,ISO45001,EN1090,CIDB,COC,PVOC,SONCAP,etc
WELDING AWS D1.1/AWS D1.5
AS/NZS 1554 or equivalent
BOLTS ISO898,AS/NZS1252,BS3692 or equivalent
GALVANIZATION CODE ISO1461
AS/NZS 4680
ASTM-A123
,
BS1706
or equivalent
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
 
Company Profile
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
Our Advantages
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
Certifications
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic RecoveryHD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
After Sales Service

HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery

Our Customers
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
FAQ
HD200 Bailey Bridge Shortens The Construction Period and Accelerates Traffic Recovery
Q: Which countries do you export to?
A: Our company's products have been exported to dozens of countries and regions. Including: Nepal, Cambodia, Laos, Vietnam, Malaysia, Myanmar, Philippines, Ecuador, Colombia, Barbados, Trinidad and Tobago, Dominica, Papua New Guinea, Solomon Islands, Kenya, Tanzania, Zambia, Congo, Tajikistan, Georgia, etc.

Q: Are you a factory or a trade company ?
A: We are an industry and trade company. The factory covers an area of 47,000 square meters, the production workshop is 22,000 square meters, and the office area is 5,000 square meters. It has 12 production lines of Bailey Bridge, various steel Bridges and various steel structure products, with a lifting capacity of 100 tons. Annual output is more than 50,000 tons. The company has its own import and export rights, with 20 years of export business experience.

Q: Do you accept custom processing?
A: Our company has an efficient and flexible technical team, we can process custom-made a variety of non-standard Bailey bridge, steel bridge, steel structure.

Q: Can your company meet American standards?
A: Yes, our products not only meet the AASHTO American standard, but also meet the British BS5400, Australia AS5100 and other international standards.

Q: Which airport is the nearest to your company? Can I visit your company anytime?
A: The nearest airports are Nanjing Lukou International Airport and Shanghai Pudong International Airport. You can visit our company  anytime, our company will issue an invitation letter and arrange to pick you up according to your needs. Your transportation and accommodation during your visit to our company will be arranged by our company.

Q: Could you send me some hard copies of your catalogues?
A: Sure. Please send us your address and contact information and we will send it to you by international express as soon as possible.

Q: Can we be your agent or distributor?
A: Our company is recruiting powerful partners all over the world for common development and win-win . Look forward to long-term cooperation with you!

Q:How soon can I receive your reply after I send you my inquiry?
A: We will give professional and technical feedback within 6 hours after receiving your inquiry . After communicate the technical parameters,we will provide quotation and preliminary design within 24 hours.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier