• Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
  • Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
  • Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
  • Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
  • Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
  • Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

After-sales Service: Guidance and Installation Services
Warranty: 3 Years
Certification: DIN, JIS, GB, BS, ASTM, AISI
Life: Permanent Bridge
Across Way: Fixed Bridge
Lane Position: Down Through Bridge
Samples:
US$ 1500/Ton 1 Ton(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Jiangsu, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Experienced Team
The supplier has 5 foreign trading staff(s) and 3 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (33)
  • Overview
  • Product Description
  • Company Profile
  • Our Advantages
  • Certifications
  • After Sales Service
  • Our Customers
  • FAQ
Overview

Basic Info.

Model NO.
GWD/CB300/Delta/HBD60/CB450
Usage
Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
Scale
Middle Bridge
Stress Characteristics
Truss Bridge
Material
Steel Bridge
Steel Grade
S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460
Loading Capacity
Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24
Model Alias
CD450, CD, 450-Type, Hbd60,CB300
Welding Standard
Aws D1.1/Aws D1.5/AS/NZS 1554 or Equivalent
Hot DIP Galvanized
ISO1461/AS/NZS 4680/ASTM-A123/BS1706
Surface Painted
Long-Term Epoxy Zinc-Rich Kit or Temporary Alkyd
Bolt
10.9s
Design Standard
Aashto/BS5400/Irc 70r /As5100/ Korea 1st Grade
Transport Package
Transported by Container/Truck in Strong Packing
Specification
Panel Dimension: 3.048m * 2.35m
Trademark
Great Wall & Evercross
Origin
Zhenjiang
HS Code
7308100000
Production Capacity
100, 000 Tons

Product Description

Product Description
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
The GWD-Type truss prefabricated bridge originated in Germany and was introduced into China for mass production through the analysis of its structure by Great Wall engineers.

The introduction of GWD-Type truss prefabricated bridge stems from the technical barriers and deficiencies of Bailey Bridge. As is known to all, Bailey Bridge is a common prefabricated steel bridge structure, which is the upper and lower bearing bridge beam with the single pin connecting truss unit as the main beam of the bridge span structure, which has the advantages of simple structure, strong adaptability and good interchangeability. But even if the load is not large, it can only reach 60 meters per single span.

Therefore, Great Wall Heavy Industry launched the GWD-Type bridge. Although the truss adopts larger steel, the structure is simpler, which not only has the advantage of strong adaptability of prefabricated Bailey steel bridge, but also makes up for the limit of span, improves the length of single span and saves the cost of bridge pier.

 
Design Values for Steel Strength (MPa)
Steel Tension, Compression and Bending Resistance fd Shearing f vd Floor Loading f cd
Model Thickness (mm)
Steel Q355/GR50/S355 ≤16 275 160 355
16~40 270 155
40~63 260 150
63~80 250 145
80~100 245 140
 
Design value for welding joint strength (MPa)
Steel Butt weld/ welding joint Fillet Weld f fd
Model Thickness(mm) Compression f cd,w Tension ftd,w Shearing fvd,w
Steel Q355/GR50/S355 ≤16 275 235 160 175
16~40 270 230 155
40~63 260 220 150
63~80 250 215 145
80~100 245 210 140


Original bailey bridge Introduction

Bailey bridge is a type of portable, pre-fabricated, truss bridge.
t was developed by Donald Coleman Bailey for emergency use.During 1980s,it was introduced to China From UK.

Bailey bridge is standard bridge equipment,adopted extensively and the most popular in the world,possessing the features of simple structure,convenient transport,speedy erection and easy disassembling.While having the advantage of heavy loading capacity,great stability and long fatigue life being capable of an alternative span,long capacity and mixture form to erect all kinds and usage of temporary bridges,emergency bridges and fixed bridges.The bridge has the advantages of few components,light weight and low cost.

We have three producing lines to manufacture Compact-100 and Compact-200

The surface disposal is painting,galvanized or anti-skid wearing such as a polyurethane bonded bauxite chip system or similar according to the requirement.
It is suitable for the load designs of HS-15,HS-20,HS-25,HL-93 and pedrail-50 etc.




Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

Compact-100 Bailey Bridge Truss Allowable Internal Force Table
Bridge Type Unreinforced Bridge Reinforce Bridge
    Allowable Internal Force SS DS TS DD TD SS DS TS DD TD
Allowable Bending Moment[M](kN·m) 788.2 1576.4 2246.4 3265.4 4653.2 1687.5 3375 4809.4 6750 9618.8
Allowable Shears force[Q](kN) 245.2 490.5 698.9 490.5 698.9 245.2 490.5 698.9 490.5 698.9

Note: The value in the table is the value of half of the bridge, and the full bridge should be multiplied by 2.

Compact-200 Bailey bridge Truss Allowable Internal Force Table(Half-bridge)

 Allowable Internal Force  Allowable Bending Moment[M]
(kN·m)

 
Allowable Shears force[Q]
(kN)

 
High-shears Union Allowable Shears Force [Q]H
(kN)

 
        Configuration                           
SS SS 1127 257 348
SSR 2254 257 348
DS DS 2525 514 696
DSR1 3381 514 696
DSR2 5050 514 696
TS TS 3800 771 1044
TSR2 5635 771 1044
TSR3 7600 771 1044
QS QS 5050 1028 1392
QSR3 7889 1028 1392
QSR4 10100 1028 1392
GREAT WALL STEEL BRIDGE SPECIFICATION
GREAT WALL
STEEL BRIDGE
Bailey bridge(Compact-200, Compact-100, LSB, PB100, China-321,BSB)
Modular bridge( GWD, HBD60,CB300,Delta, 450-type,etc),
Truss Bridge,Warren bridge,
Arch bridge, Plate bridge,Beam bridge,Box girder bridge,
Suspension bridge,Cable-stayed bridge,
Floating bridge,etc
DESIGN SPANS 10M TO 300M Single span
CARRIAGE WAY SINGLE LANE, DOUBLE LANES,MULTILANE,WALKWAY,ETC
LOADING CAPACITY AASHTO HL93.HS15-44,HS20-44,HS25-44,
BS5400 HA+20HB,HA+30HB,
AS5100 Truck-T44,
IRC 70R Class A/B,
NATO STANAG MLC80/MLC110.
Truck-60T,Trailer-80/100Ton,etc
Korea 1st grade bridge DB24
STEEL GRADE  EN10025 S355JR S355J0/EN10219 S460J0/EN10113 S460N/BS4360 Grade 55C
AS/NZS3678/3679/1163/Grade 350,
ASTM A572/A572M GR50/GR65
GB1591 GB355B/C/D/460C,etc
CERTIFICATES ISO9001, ISO14001,ISO45001,EN1090,CIDB,COC,PVOC,SONCAP,etc
WELDING AWS D1.1/AWS D1.5
AS/NZS 1554 or equivalent
BOLTS ISO898,AS/NZS1252,BS3692 or equivalent
GALVANIZATION CODE ISO1461
AS/NZS 4680
ASTM-A123
,
BS1706
or equivalent
Inspection and Maintenance
Components of bridge Inspection items Method of maintenance Frequency
Abutment & Support Examine if any cracks found on the abutments and the river embankment is in good condition If there are small cracks found on the abutments, use cement mortar to fill the crack to prevent erosion of the reinforcing bars inside the abutments. If there is damaged of the embankment, application of a mixture of cement mortar with scribbles to fill the cracks Once per month
Any reshape or damage of the support Replace the support if it is seriously damaged. (suggest Implementing by professional)
Bailey panel Any rusting to the steel panels Keep the bridge dry and clean. Apply melding and anticorrosive Coating Once per month
Any missing parts of the bridge structure Inform supervisor timely, and report to the local officials for the bridge status
Any damage or relocation of bridge components Stop crossing the bridge and report to the immedi- ate supervisor. Seek help from professionals
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
 
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
 
Company Profile
 
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
 
Our Advantages

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

 

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

 

Certifications
 

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

 

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

 

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

 

After Sales Service
 
Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible
 

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

 
Our Customers

 

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible

 
FAQ

Permanent Bailey Truss Bridge Large Span of Prefabricated and Flexible


Q: Which countries do you export to?
A: Our company's products have been exported to dozens of countries and regions. Including: Nepal, Cambodia, Laos, Vietnam, Malaysia, Myanmar, Philippines, Ecuador, Colombia, Barbados, Trinidad and Tobago, Dominica, Papua New Guinea, Solomon Islands, Kenya, Tanzania, Zambia, Congo, Tajikistan, Georgia, etc.

Q: Are you a factory or a trade company ?
A: We are an industry and trade company. The factory covers an area of 47,000 square meters, the production workshop is 22,000 square meters, and the office area is 5,000 square meters. It has 12 production lines of Bailey Bridge, various steel Bridges and various steel structure products, with a lifting capacity of 100 tons. Annual output is more than 50,000 tons. The company has its own import and export rights, with 20 years of export business experience.

Q: Do you accept custom processing?
A: Our company has an efficient and flexible technical team, we can process custom-made a variety of non-standard Bailey bridge, steel bridge, steel structure.

Q: Can your company meet American standards?
A: Yes, our products not only meet the AASHTO American standard, but also meet the British BS5400, Australia AS5100 and other international standards.

Q: Which airport is the nearest to your company? Can I visit your company anytime?
A: The nearest airports are Nanjing Lukou International Airport and Shanghai Pudong International Airport. You can visit our company  anytime, our company will issue an invitation letter and arrange to pick you up according to your needs. Your transportation and accommodation during your visit to our company will be arranged by our company.

Q: Could you send me some hard copies of your catalogues?
A: Sure. Please send us your address and contact information and we will send it to you by international express as soon as possible.

Q: Can we be your agent or distributor?
A: Our company is recruiting powerful partners all over the world for common development and win-win . Look forward to long-term cooperation with you!

Q:How soon can I receive your reply after I send you my inquiry?
A: We will give professional and technical feedback within 6 hours after receiving your inquiry . After communicate the technical parameters,we will provide quotation and preliminary design within 24 hours.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now