Steel Structure Corridor Pedestrian Bridge Tailor-Made

Product Details
Customization: Available
After-sales Service: Guidance and Installation Services
Warranty: 3 Years
Still deciding? Get samples of US$ 1500/Ton
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Experienced Team
The supplier has 5 foreign trading staff(s) and 3 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (33)
  • Steel Structure Corridor Pedestrian Bridge Tailor-Made
  • Steel Structure Corridor Pedestrian Bridge Tailor-Made
  • Steel Structure Corridor Pedestrian Bridge Tailor-Made
  • Steel Structure Corridor Pedestrian Bridge Tailor-Made
  • Steel Structure Corridor Pedestrian Bridge Tailor-Made
  • Steel Structure Corridor Pedestrian Bridge Tailor-Made
Find Similar Products
  • Overview
  • Product Description
  • Company Profile
  • Our Advantages
  • Certifications
  • After Sales Service
  • Our Customers
  • FAQ
Overview

Basic Info.

Model NO.
PB100
Life
Permanent Bridge
Across Way
Fixed Bridge
Lane Position
Down Through Bridge
Usage
Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
Scale
Middle Bridge
Stress Characteristics
Truss Bridge
Material
Steel Bridge
Steel Grade
S355/Gr 55c/Gr350/Gr50/Gr65/GB355/460
Loading Capacity
People Walking
Walkway Net Width
1.3m ~ 1.5m
Maximum Free Span
16m
Panel Dimension
2m * 1.2m
Surface
Hot DIP Galvanized
Welding
Aws D1.1/Aws D1.5/AS/NZS 1554 or Equivalent
Transport Package
Transported by Container/Truck in Strong Packing
Specification
2m * 1.2m
Trademark
GreatWall
Origin
Zhenjiang
HS Code
7308100000
Production Capacity
100, 000 Tons

Product Description

Product Description
 
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Upon years of discussion and collaboration, PB100 Modular footbridge has applied the advantages of Bailey bridge and optimal choice of material in its projects. Great Wall Steam have been entrusted to develop and design a light-weighted PB100 Modular footbridge. The bridge design has been given due considerations to the demand of function, natural environmental condition, technical feasibility, material transportation and cost etc. As the requirement on loading was smaller, the structural members of the bailey panel could be re-designed to a lighter weight, meeting its needs on economic, transportation, construction and other means. With the premise of ensuring safety, PB100 Modular footbridge excels the conventional Bailey bridge limitations as mentioned and it has its unique advantage of application in the PB100 Modular footbridge projects.
 
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Design Values for Steel Strength (MPa)
Steel Tension, Compression and Bending Resistance fd Shearing f vd Floor Loading f cd
Model Thickness (mm)
Steel Q235 ≤16 190 110 280
16~40 180 105
40~100 170 100
Steel Q345 ≤16 275 160 355
16~40 270 155
40~63 260 150
63~80 250 145
80~100 245 140
 
Design value for welding joint strength (MPa)
Steel Butt weld/ welding joint Fillet Weld f fd
Model Thickness(mm) Compression f cd,w Tension ftd,w Shearing fvd,w
Steel Q235 ≤16 190 160 110 140
16~40 180 155 105
40~100 170 145 100
Steel Q345 ≤16 275 235 160 175
16~40 270 230 155
40~63 260 220 150
63~80 250 215 145
80~100 245 210 140

Inspection and Maintenance
Components of bridge Inspection items Method of maintenance Frequency
Abutment & Support Examine if any cracks found on the abutments and the river embankment is in good condition If there are small cracks found on the abutments, use cement mortar to fill the crack to prevent erosion of the reinforcing bars inside the abutments. If there is damaged of the embankment, application of a mixture of cement mortar with scribbles to fill the cracks Once per month
Any reshape or damage of the support Replace the support if it is seriously damaged. (suggest Implementing by professional)
Bailey panel Any rusting to the steel panels Keep the bridge dry and clean. Apply melding and anticorrosive Coating Once per month
Any missing parts of the bridge structure Inform supervisor timely, and report to the local officials for the bridge status
Any damage or relocation of bridge components Stop crossing the bridge and report to the immedi- ate supervisor. Seek help from professionals

Steel Structure Corridor Pedestrian Bridge Tailor-Made
Steel Structure Corridor Pedestrian Bridge Tailor-Made

Steel Structure Corridor Pedestrian Bridge Tailor-Made
Steel Structure Corridor Pedestrian Bridge Tailor-Made

 

Company Profile
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Our Advantages
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Certifications
Steel Structure Corridor Pedestrian Bridge Tailor-MadeSteel Structure Corridor Pedestrian Bridge Tailor-Made
After Sales Service

Steel Structure Corridor Pedestrian Bridge Tailor-Made
Steel Structure Corridor Pedestrian Bridge Tailor-Made

Our Customers
Steel Structure Corridor Pedestrian Bridge Tailor-Made
FAQ
Steel Structure Corridor Pedestrian Bridge Tailor-Made
Q: Which countries do you export to?
A: Our company's products have been exported to dozens of countries and regions. Including: Nepal, Cambodia, Laos, Vietnam, Malaysia, Myanmar, Philippines, Ecuador, Colombia, Barbados, Trinidad and Tobago, Dominica, Papua New Guinea, Solomon Islands, Kenya, Tanzania, Zambia, Congo, Tajikistan, Georgia, etc.

Q: Are you a factory or a trade company ?
A: We are an industry and trade company. The factory covers an area of 47,000 square meters, the production workshop is 22,000 square meters, and the office area is 5,000 square meters. It has 12 production lines of Bailey Bridge, various steel Bridges and various steel structure products, with a lifting capacity of 100 tons. Annual output is more than 50,000 tons. The company has its own import and export rights, with 20 years of export business experience.

Q: Do you accept custom processing?
A: Our company has an efficient and flexible technical team, we can process custom-made a variety of non-standard Bailey bridge, steel bridge, steel structure.

Q: Can your company meet American standards?
A: Yes, our products not only meet the AASHTO American standard, but also meet the British BS5400, Australia AS5100 and other international standards.

Q: Which airport is the nearest to your company? Can I visit your company anytime?
A: The nearest airports are Nanjing Lukou International Airport and Shanghai Pudong International Airport. You can visit our company  anytime, our company will issue an invitation letter and arrange to pick you up according to your needs. Your transportation and accommodation during your visit to our company will be arranged by our company.

Q: Could you send me some hard copies of your catalogues?
A: Sure. Please send us your address and contact information and we will send it to you by international express as soon as possible.

Q: Can we be your agent or distributor?
A: Our company is recruiting powerful partners all over the world for common development and win-win . Look forward to long-term cooperation with you!

Q:How soon can I receive your reply after I send you my inquiry?
A: We will give professional and technical feedback within 6 hours after receiving your inquiry . After communicate the technical parameters,we will provide quotation and preliminary design within 24 hours.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier